Odessa
Manufacturing and installation of block-modular boiler houses – 3 units, 2 MW each.
Gostomel
Design and installation of a gas supply system for a glass-melting furnace at PJSC Vetropack.
Kharkiv city
Manufacturing and installation of modular boiler rooms – 17 units (200 kW-2 MW).
Kyiv region
Manufacturing and installation of modular pellet boiler rooms – 5 pcs.
Boyarka
Design and installation of the gas supply system of the Vents plant.
Irpin
Reconstruction of the boiler house of the checkpoint “Teploenergopostach” – 2 boilers of 4 MW each.
Lisichansk
Reconstruction of boiler houses: 2 boilers of 300 kW each (pellets), 2.2 MW gas boiler house.
Pavlograd. Pavlograd maternity hospital
Gas boiler Colvi (2 x 640 kW). Delivery, installation, commissioning.
from. P. Borschagovka. KP “Borschagovka”
Reconstruction of the boiler house gas supply system (4 MW).
Mirgorod. OKVPTG “Mirgorodteploenergo” (USAID)
Gas boiler Colvi (3×1000 kW).
Straw boiler “Comkont” 1 MW.
Delivery, installation, commissioning.
PS OSS “Central Market of Sumy”.
Gas boiler Kolvi (2 x 1000 kW).
Gas boiler Colvi (348 kW).