Completed projects

Проекты котельных
List of completed works in cities

Odessa Manufacturing and installation of block-modular boiler houses – 3 units, 2 MW each Gostomel Design and installation of a gas supply system for a glass-melting furnace at PJSC Vetropack Harkov city Manufacturing and installation of modular boiler rooms – 17 units (200 kW-2 MW) Kiev oblast Manufacturing and installation of modular pellet boiler rooms […]

Odessa

Manufacturing and installation of block-modular boiler houses – 3 units, 2 MW each.

 

Gostomel

Design and installation of a gas supply system for a glass-melting furnace at PJSC Vetropack.

 

Kharkiv city

Manufacturing and installation of modular boiler rooms – 17 units (200 kW-2 MW).

 

Kyiv region

Manufacturing and installation of modular pellet boiler rooms – 5 pcs.

 

Boyarka

Design and installation of the gas supply system of the Vents plant.

 

Irpin

Reconstruction of the boiler house of the checkpoint “Teploenergopostach” – 2 boilers of 4 MW each.

 

Lisichansk

Reconstruction of boiler houses: 2 boilers of 300 kW each (pellets), 2.2 MW gas boiler house.

 

Pavlograd. Pavlograd maternity hospital

Gas boiler Colvi (2 x 640 kW). Delivery, installation, commissioning.

 

from. P. Borschagovka. KP “Borschagovka”

Reconstruction of the boiler house gas supply system (4 MW).

 

Mirgorod. OKVPTG “Mirgorodteploenergo” (USAID)

Gas boiler Colvi (3×1000 kW).
Straw boiler “Comkont” 1 MW.

 

Delivery, installation, commissioning.

PS OSS “Central Market of Sumy”.
Gas boiler Kolvi (2 x 1000 kW).
Gas boiler Colvi (348 kW).

Contact with us

Contacts

You choose us, so we will create all conditions for comfortable and mutually beneficial cooperation

Address Ukraine, Kyiv oblast,
Sofievskaya Borshagovka, st. Gorky, 1
Opening hours: Mon-Fri 9:00-18:00




    Please prove you are human by selecting the Plane.