Odessa

Manufacturing and installation of block-modular boiler houses – 3 units, 2 MW each

Gostomel

Design and installation of a gas supply system for a glass-melting furnace at PJSC Vetropack

Harkov city

Manufacturing and installation of modular boiler rooms – 17 units (200 kW-2 MW)

Kiev oblast

Manufacturing and installation of modular pellet boiler rooms – 5 pcs.

Boyarka

Design and installation of the gas supply system of the Vents plant

Irpin

Reconstruction of the boiler house “Irpinitepopostachannya” – 2 boilers of 4 MW each

Lisichansk

Reconstruction of boiler houses: 2 boilers of 300 kW each (pellets), 2.2 MW gas boiler house

Pavlograd. Pavlograd maternity hospital

Gas boiler Colvi (2 x 640 kW). Delivery, installation, commissioning.

from. P. Borschagovka. KP “Borschagovka”

Reconstruction of the boiler house gas supply system (4 MW)

Mirgorod. OKVPTG “Mirgorodteploenergo” (USAID)

Gas boiler Colvi (3×1000 kW).
Straw boiler “Comkont” 1 MW

Delivery, installation, commissioning.

PS OSS “Central Market of Sumy”
Gas boiler Kolvi (2 x 1000 kW).
Gas boiler Colvi (348 kW).


Share:


Contact with us

Contacts

You choose us, so we will create all conditions for comfortable and mutually beneficial cooperation

Address Ukraine, Kyiv oblast,
Sofievskaya Borshagovka, st. Gorky, 1
Opening hours: Mon-Fri 9:00-18:00




    Please prove you are human by selecting the Plane.